qdtent.en.alibaba.com     chinese     

sales01@qdtent.com+86-532-83232098qdtent.en.alibaba.com     chinese     
Location: Home » News Center» Company News

The time from slaughter and bolldletting to carcass processing2020/7/2 15:56:25

The time from slaughter and bolldletting to carcass processing...

The time from slaughter and bolldletting to carcass processing2020/7/2 15:56:25

The time from slaughter and bolldletting to carcass processing...

I level slaughtering wodkshop by product peocessing production stass locker room should be set separately.2020/7/2 15:54:19

I level slaughtering wodkshop by product peocessing production stass locker room should be set separately....

The end of the transfrer platform shall be wqipped with a hoist to lift the peeled pig catcass noto the track2020/7/1 16:13:29

The end of the transfrer platform shall be wqipped with a hoist to lift the peeled pig catcass noto the track...

There should be a convenient 82 hot water disinfection facility near the splitting tool.2020/7/1 16:12:03

There should be a convenient 82 hot water disinfection facility near the splitting tool....

The slaughter time of eace shift should be calculated accorkding to7h2020/6/29 10:52:41

The slaughter time of eace shift should be calculated accorkding to7h...

The flow of blood,hair,skin,hoof and waser products shall not pollute the products amd tte the products and the surrounding environment.slaughtered equipement.2020/6/29 10:50:09

The flow of blood,hair,skin,hoof and waser products shall not pollute the products amd tte the products and the surrounding environment.slaughtered equipement....

I level slaughtering workshop by prodect processing peoduction staff locker room should be set separately2020/6/24 14:35:18

I level slaughtering workshop by prodect processing peoduction staff locker room should be set separately...

The equipment of slaughterign woekshop should be made of non-rested metal or hor dip galvanized steel. slaughter equipment2020/6/24 14:32:23

The equipment of slaughterign woekshop should be made of non-rested metal or hor dip galvanized steel. slaughter equipment...

Technological process shouldbe set up to avoid roundabout crossing,eace link on the production2020/6/22 10:29:11

Technological process shouldbe set up to avoid roundabout crossing,eace link on the production...

Carcasses that pass inspection hsall be transported suspension to the carcass deliceruy or cooling room. cattle slaugher line2020/6/22 10:27:42

Carcasses that pass inspection hsall be transported suspension to the carcass deliceruy or cooling room. cattle slaugher line...

Its unreasonble to put the slaughtered chicken directly into the cold storage.2020/6/20 9:38:18

Its unreasonble to put the slaughtered chicken directly into the cold storage....

By-products include heart,liver,lung,stomach,head,hoof,tail,etc2020/6/20 9:34:43

By-products include heart,liver,lung,stomach,head,hoof,tail,etc...

The equipment of slaughtering woekshop should be made of non rested metal or hot dip galvanized steel.2020/6/12 10:04:31

The equipment of slaughtering woekshop should be made of non rested metal or hot dip galvanized steel....

The desogn te,[erature pf raw ,ateroa; cpp;omg rpp, amd perduce cooling room slhould be 42020/6/12 10:03:21

The desogn te,[erature pf raw ,ateroa; cpp;omg rpp, amd perduce cooling room slhould be 4...

By product include heart liver lung stomach head hoof tail etc.which should be processed in soprate rooms.2020/6/11 16:55:01

By product include heart liver lung stomach head hoof tail etc.which should be processed in soprate rooms....

When using conveyor chute to transopr raw materials if shall be equippeed with cecessacey cleacing and disinfection facilies.2020/6/11 16:53:29

When using conveyor chute to transopr raw materials if shall be equippeed with cecessacey cleacing and disinfection facilies....

Raw material pre-cooling room,raw material cooling room,product cooling room shall be at least two.2020/6/9 16:03:20

Raw material pre-cooling room,raw material cooling room,product cooling room shall be at least two....

I Level slaughtering woekshop by peoduct processign prodection staff locker room shouod be set separately.2020/6/9 16:01:48

I Level slaughtering woekshop by peoduct processign prodection staff locker room shouod be set separately....

The division woekshop shall be equipped with fork shtops for hanging the catcass ans cleaning and disinfection facilities gor stinless steel hooks.2020/6/8 15:06:08

The division woekshop shall be equipped with fork shtops for hanging the catcass ans cleaning and disinfection facilities gor stinless steel hooks....

The ground should be made of impermeable and easy to clean materials.2020/6/8 15:04:45

The ground should be made of impermeable and easy to clean materials....

When using coneryor chute to teanshope waw materials,it shall be wquipped with nrcessaru cleaning and disinfection facilities.2020/6/5 14:45:29

When using coneryor chute to teanshope waw materials,it shall be wquipped with nrcessaru cleaning and disinfection facilities....

By prooduce include heart,liver,lung stomach,head,hoof,tail,etc2020/6/5 14:41:38

By prooduce include heart,liver,lung stomach,head,hoof,tail,etc...

The height of the track surface from the ground shall not be less than2.5.2020/6/4 10:40:45

The height of the track surface from the ground shall not be less than2.5....

No silde shall be used goe conveying raw materials and prodects for cutting meat.2020/6/4 10:38:06

No silde shall be used goe conveying raw materials and prodects for cutting meat....

The slaughtering and cutting workshop shall be equipped with non-manualhand washing equipment and hand drying facilities.2020/6/3 8:53:37

The slaughtering and cutting workshop shall be equipped with non-manualhand washing equipment and hand drying facilities....

The toilet shall have a front room connected to the walkway of the workshop.2020/6/3 8:45:02

The toilet shall have a front room connected to the walkway of the workshop....

The slaughterign and cutting woekshop shall be equipped2020/5/30 13:18:47

The slaughterign and cutting woekshop shall be equipped...

The toil shall have a fornt room commected to the walkway of the woekshop.2020/5/30 13:16:29

The toil shall have a fornt room commected to the walkway of the woekshop....

The slaughter process shall be set in the order of slaughter2020/5/29 8:51:52

The slaughter process shall be set in the order of slaughter...

Our Clients

News Center News Center
CONTACT US
Hotline:

+86-532-83232098

E-Mail:sales01@qdtent.com

addr:No. 1, Minan Road, Jiaoxi Industrial Park, Jiaozhou, Shandong, China

 
Aaron
Whatsapp:+8615763906688
Wechat:+8615763906688
Email: sales01@qdtent.com
 
Andy 
Whatsapp:+8615969856551 
Wechat:+8615969856551 
Email:sales04@qdtent.com 
 
Yolanda 
Whatsapp:+8615969858075 
Wechat:+8615969858075 
Email:sales05@qdtent.com 
 
Nancy 
Whatsapp:+8615092165018 
Wechat:+8615092165018 
Email:sales02@qdtent.com 
 
Peter
Whatsapp:+8615963236197
Wechat:+8615963236197
Email:sales03@qdtent.com
 
Telephone: +86-0532-83232098
Mobile:+8615763906688
Website: www.qdtenten.com